The transportation of 2 tunnel drilling machines from State  of Washington, USA to the northern part of Norway.
The machines were transported to Rotterdam where they were loaded on a heavy lift seagoing vessel with a lifting capacity of 350 tonnes.
In the town of Bodø, north of the Polar circle, both machines were unloaded and positioned on heavy lift trailers for further transportation into the Norwegian mountains where they are used for drilling tunnels for hydro power plants.
LINCO-FREIGHT was resposible for the complete operation from door to door.

 

Im0009s.jpg (40500 bytes)

1 of 2 mainbeams, dimensions 8,50*3,10*3,00m   -  89.000 kgs

Upon discharging of very heavy loads using the ships own gear, the correct ballasting of the vessel is  crucial. 

Image1.jpg (53271 bytes)

Discharging the mainbeam - seen from an angle where the crane rig of the ship is clearly displayed

im0084.jpg (20869 bytes) 0010sm.jpg (18369 bytes)

Reloading of a drilling head onto a heavy weight trailer for transportation to final site. 

1 of 2 drilling heads, dimensions are 4,20*4,20*3,00m - 93.000 kgs


Image6.jpg (49640 bytes)



Discharging of the mainbeam from ship to heavy weight trailer - using the ships own gear.


 