4 maingirders from
Poland to the new terminal at Copenhagen Airport.
This transportation was performed under extreme weather conditions i.e. snow, wind and
during nighttime.
Heavy duty trailer was backed up on the barge and then under the girder, lifting girder
from barge using the hydraulics of the trailer, and then rolled off the barge.
Dimensions 50,00m * 6.35m * 7,50m - 116 tons each.
|
|

Arrival
of girder to port.
|
|

Heavy
duty trailer backed to the end of the barge, hanging out 3 meters
over the water, then lifting girder from barge, ready to roll off.
|
|
Girder parked awaiting nighttime for final delivery to site in the
airport.
(Do note the car parked under the girder).
|
 |
|